Peak Engineering Ltd. 

 

Home   Company   Building   


Investigation   Special Structures  

 

---

BRIAN LYTTON, P. Eng., P. E.

BUILDINGS

MUNICIPAL PROJECTS

TRANSPORTATION PROJECTS

PROJECT MANAGEMENT

---

WORK HISTORY

1997-present     Peak Engineering Ltd., Maple Ridge, B.C.

1994-1997        Klohn-Crippen Consultants Ltd., Richmond, B.C.

1990-1994        PBK Engineering Ltd., Vancouver, B.C.

1989-1990        Ministry of Transportation, Burnaby, B.C.

1986-1989        Kaiser Engineers Inc., Ft. Lauderdale, Florida

1984-1986        Geiger Associates Ltd., Vancouver, B.C.

1981-1984        PBK Engineering Ltd., Vancouver, B.C.

Mr. Lytton is a principal and senior structural engineer for Peak Engineering Ltd. with 26 years of engineering design and project management. Project experience includes building structures, bridges, transit facilities and special structures.

---

 EDUCATION

University of British Columbia                       B. A.Sc. in Civil Engineering in 1979 

University of British Columbia                      M. Eng. in Structural Engineering in (1981)

---

 PROFESSIONAL REGISTRATIONS

 Registered Professional Engineer in British Columbia, Alberta and Washington 

---

BUILDINGS

Engineering design and inspection for numerous residential design projects with Peak Engineering.  As well, a variety of renovation designs for renovated houses including lifting of house to add floor below and adding second floor to existing rancher structure. 

Retrofit design of various Petro-Canada stations during last upgrade of stations.

Petro-Canada Station, 22nd. & Marine, West Vancouver (1998) Design engineer for new masonry-block service building, including engineered lintels, glulam beams and reinforced-concrete retaining walls and foundation.

Maple Ridge "Motor Sports" Building, Maple Ridge (1998) Design engineer for masonry-block wall addition to existing building on Lougheed Hwy. in Maple Ridge, including foundations.

"Triple Tree Nursery" Masonry wall, Maple Ridge (1995) Design engineer for new greenhouse canopy masonry block wall support. Special L-shaped footing design was required to accommodate very tight property line location.

Expo '86 Foreshore Structure, Vancouver, B. C. (1985 - 1986) Design of foreshore structure for Expo '86 to support pavilion and truck loading, including timber piles (severe soil conditions), pile load-testing, piers and concrete box stringers.

Expo '86 Structures, Vancouver, B. C. (1985) Project engineer for design of special 13m radius, triangular-truss steel hoop structures for Expo '86 Corporation, preparation of specifications, shop inspection and site inspection.

Canada Harbour Place, Vancouver, B. C. (1984) Structural design of cable-supported fabric roof for Expo '86 Canadian pavilion and present Vancouver Convention Centre (cables, anchorages and Weldment design.)

Canada Place Cruiseship Gangway, Vancouver, B. C. (1989) Project engineer for redesign of cruiseship walkway/gangway structure (steel truss) at Canada Harbour Place cruiseship facility in Vancouver to replace a previous structure.

Waterfront Floating Breakwater, Portland, Oregon (1984) Detailed flotation design for reinforced concrete hollow-core breakwater at Portland for Bellingham Marine Industries.

Citrus Bowl Stadium Expansion, Orlando, Florida (1988) Structural design review of upper-deck expansion of 60,000 seat Citrus Bowl Stadium in Florida, using precast concrete columns, girder and seating units (with longitudinal post-tensioning) on new spread footings.

Swine-Rearing Facility, Abbotsford, B. C. (1993) Detailed structural design of new 20,000 sq. m. hog-rearing structure for Taiwanese client in the Fraser Valley. Timber frame structure with precast and cast-in-place concrete substructure. Roof structure consists of over 1000 prefabricated timber mono-trusses.

Concord Pacific Seawall Structures, Vancouver, B.C. (1993) Project Engineer detail design and design review of piled deck/retained-earth structures for Concord Pacific Developments Ltd., in False Creek area.

Barge-Loading Facility, Port Alice, B.C. (1993) Project engineer for condition survey, analysis and retrofit for existing steel space-truss barge loading structure for Imasco Minerals.

Alcan Conveyor Galleries, Kitimat, B.C. (1993) Design engineer for design of new conveyor galleries (2 steel box trusses 75m long) for Alcan in Kitimat. Duties included complete design, retrofit of existing penthouses and design capacity review of existing structures. Design scheme was selected for cost effectiveness and ease of construction to suit critical project shutdown schedule.

Eburne Sawmill Inspection, Vancouver, B.C. (1989) Detailed structural inspection of timber-frame sawmill structure built in early 1900's. Duties included site inspection, review of all available structure information, structure evaluation, and final report to client.

MUNICIPAL PROJECTS

Pitt Meadows 1997 Capital Works Inspection (1997) Provided inspection services and engineering review during construction of new paving, road widening and waterline installation, for District of Pitt Meadows.

TRANSPORTATION PROJECTS

Hanoi City Infrastructure - Vietnam (1997)

Bridge design engineer responsible for rehabilitation of over 75 bridges (small to medium spans) in Hanoi City as part of international Drainage Project for Environment Improvement in Hanoi (first stage.) Working on contract with Associated Engineering Ltd., (Burnaby, B.C.) as subconsultant to major Japanese transportation consultant (Nippon-Koei.) Scope of work included preparation of Terms of Reference for Vietnamese design consultants, including Design Criteria to be used on project (foundation pile design criteria also developed for all consultants), and technology transfer to local engineers and technicians.

Bridge Rehabilitation -Vietnam (1996)

Project engineer for rehabilitation of 36 bridges (small to medium spans) on National Highway No. 1 in Hanoi. Leading substructure design team as subconsultant for joint venture partner, Nippon Koei of Tokyo. Substructure design utilized 1.0m bored caisson piles extensively. Reviewed design of superstructure precast concrete I-girders. Duties included final design and contract documents.

Buckley Bay Railway Underpass, Vancouver Island, B.C. (1996)

Review Bridge engineer for proposed new underpass on E&N Railway, Mileage 126.15, Victoria Subdivision, to suit construction of new Vancouver Island Highway alignment. Proposed underpass is a 16m ballasted steel through-plate girder with sidewalk, founded on piled abutments with anchored sidewalls to accommodate the proposed roadway underneath the railway.

Alcan Tower Base Investigation, Kitimat, B.C. (1996)

Site investigation (remote access by helicopter) of avalanche-damaged base of hydroelectric tower. Duties included structural load review, estimate of load capacity remaining and preparation of remedial repairs to concrete foundation and anchor assemblies.

Lytton Bridge Replacement, Lytton, B.C. (1995)

Project Manager for proposed new four-span 220m bridge over Thompson River at intersection of the Fraser River. The new bridge replaces an existing structure built in 1913. The new two-lane structure will have a concrete deck on steel plate girders, with concrete abutments and high, slender piers.

Jacob Haldi Bridge, Fort Langley, B.C. (1993)

Project engineer for preliminary design and construction phases for new nine-span, 180m long continuous reinforced-concrete deck/precast I-girder bridge in Fort Langley for Ministry of Transportation and Highways. Revised quantity and location of steel pipe pile foundations, and also revised pile cap details to accommodate severe foundation constraints (soft soil) during construction.

Annacis Channel West Bridge, Richmond, B.C. (1994)

Project Manager for concrete-alternative approach bridge structures for Ministry of Transportation and Highways. The land access ramp is a five-span structure with adjacent two-span access ramp structure. Sensitive soft-soil conditions remodelled in dynamic analysis (SEISAB) bridge program.

Marshall Creek Bridge, Abbotsford, B.C. (1996)

Project Manager/Project Engineer for complete conceptual and detail design of replacement bridge on Hwy. 11, for developer Chard Retail Ltd., with liasion and co-ordination with Ministry of Transportation and Highways. Cost-effective box girder design enabled client to meet critical environmental requirements.

Savona Bridge, Kamloops, B.C. (1993)

Project Engineer for design of substructure and review of superstructure for new five-span steel plate girder/concrete deck bridge over the CNR on Highway No. 1. Complete review of shop drawings and shop inspection.

Thames Creek/Chef Creek Bridges, Nanaimo, B.C. (1994)

Preliminary design of two separate bridge structures on proposed Vancouver Island Highway route. Duties included preliminary design and cost estimates of several alternate schemes incorporated into Preliminary Design Report.

Richmond No. 2 Bridge, Richmond B. C. (1992)

Lead structural engineer and roadworks review engineer for conceptual design of new 4 lane, 540m long bridge over Middle Arm of Fraser River for the City of Richmond. Duties included evaluation review of superstructure alternatives, with recommended selection of post-tensioned segmental box girder superstructure, review of roadworks contract documents and liaison with Richmond Engineering staff.

Arthur Laing Bridge Seismic Retrofit Study, Richmond B.C. (1992)

Review of seismic analysis and proposed retrofit concepts; preparation of retrofit scheme cost estimate presented to YVR Airport Authority.

Arthur Laing Bridge Condition Survey (1991)

Project engineer for detailed condition survey of bridge including subconsultant co-ordination (survey and underwater inspection) and preparation of final report for YVR Airport Authority.

Broadway Bridge Replacement, Vancouver, B. C. (1991)

Project manager and lead structural engineer for the replacement of the existing Broadway Bridge over the Grandview Cut, for the City of Vancouver, designed to suit severe site constraints; future roadways and B. N. R. track relocation in the Cut; very tight site, bounded by commercial developments (existing and proposed) and a major intersection (Victoria Drive/Grandview Highway); and B. C. Transit operations. Work included conceptual design and report preparation, co-ordination of project team and subconsultants, specification preparation, tender review and construction management.

Automated Skyway Express, Jacksonville, Florida (1986 - 1988)

Trackwork design project engineer for people-mover project in downtown Jacksonville. Duties included all structural design, geometric design review, shop drawing review and approval and preparation of cost estimates and specifications.

Chicago Automated Guideway Transit, Chicago, Illinois (1988 - 1989)

Design of trackwork and preparation of specifications for 5 km people-mover rail project at O'Hare airport in Chicago.

Advanced Light Rapid Transit (Section E), Vancouver, B. C. (1983)

Design of 3.3 km section of A. L. R. T. System in Vancouver including computer mathematization of system alignment and computer analysis and design of special Grandview Cut Crossing Structure.

Skytrain Column Relocation, Vancouver, B. C. (1991)

Project engineer for proposed relocation of existing Skytrain column in Grandview Cut so as to provide clearance to future City of Vancouver roadway through the Cut; Existing crosshead beam is proposed to be encapsulated into a new post-tensioned beam with new end wall and end column support.

Carrall Street Landbridge, Vancouver, B. C. (1993)

Project manager for design and construction of 30 m single span post-tensioned cast-in-place concrete pedestrian bridge for Concord Pacific Development Ltd.

Tsawwassen Terminal-North Transfer Deck, Delta, B. C. (1991)

Conceptual and preliminary design of new elevated steel transfer deck for the B. C. Ferry Corporation at Tsawwassen. The transfer deck, designed to be easily removeable and to suit a very short construction schedule, consists of an orthotropic steel deck on steel portal frames, supported on expanded-base concrete piles. Duties included leading design team, preparation of detail specifications and cost estimates, site inspection, shop inspection and client liaison.

Horseshoe Bay Terminal, Foot Passenger Facilities, West Vancouver, B. C. (1993)

Project engineer for structural concept and design of new pedestrian overhead walkway facilities in heavily-congested ferry terminal. Severe site constraints and short construction time frame necessitated a cost-effective, easily constructible scheme of structural steel trusses and plate girders, using existing structures for support.

Deas Slough Deck Rehabilitation, Richmond, B. C. (1989 - 1990)

Design engineer for the proposed complete deck replacement of existing 3-span continuous steel girder, dual roadway bridge for M. O. T. H. on Highway 99. Traffic considerations necessitated the need for night-time construction with precast concrete segments grouted in place and longitudinally post-tensioned.

Deas Slough Bearing Replacement, Delta, B. C. (1989)

Design engineer for the replacement of existing steel rocker bearings with lead core seismic isolation bearings; site inspection for critical diaphragm jacking at night with live load restricted.

Olson Overhead, Fernie, B. C. (1991)

Project engineer for the design of a 3 span continuous concrete box-stringer bridge for M. O. T. H. on Crowsnest Highway No. 3, including abutments and piers on spread footings; coordination and liaison with Region officials.

Cayoosh Creek Bridge/Lower Joffre Creek Bridge, Pemberton, B. C. (1989)

Project engineer for the design of new 28m single-span prestressed concrete I-girder bridges on Duffey Lake Road. Duties included evaluation of alternatives, design and preparation of specifications, quantities and cost estimates.

McInnes Street Overpass, New Westminster, B. C. (1982)

Design of reinforced concrete bridge over Columbia St. in New Westminster. Assisted in foundation, pier, box strings and expansion joint design.

Bridge Replacement in Volusia County, Florida (1988)

Bridge design engineer for replacement of eight bridges over SR5 in Volusia County. Duties included structural design, shop drawing review and approval and preparation of cost estimates and specifications.

PROJECT MANAGEMENT

Oak Street Bridge Deck Rehabilitation, Vancouver, B.C. (1995)

Project manager for the rehabilitation of the 2 km Oak Street Bridge, including repair of concrete deck, waterproof membrane, replacement of deck joints, addition of curb parapets, design of new sidewalk panels, and repair of cast-in-place concrete girders deficient in shear, and preparation of contract documents which included bonus/penalty incentive clauses.

McGill Street Overpass/Commissioner St. Extension, Vancouver (1993 - 1994)

Project engineer for proposed new overpass over CPR and roadway extension for Vancouver Port Corporation. Lead bridge engineer, roadworks review engineer and project management /client liaison duties.

Tsawwassen Ferry Terminal-North Transfer Deck, Delta, B. C. (1991)

Project manager for design and construction of new elevated orthotropic-steel transfer deck ($2.0M capital cost) at Tsawwassen Terminal for B. C. Ferry Corporation. Duties included leading design team, tender evaluation, contract administration, sub-consultant co-ordination and client liaison.

South Coast Region Bridge Management, Burnaby B. C. (1990)

Regional Bridge Design and Construction Engineer for the Ministry of Transportation and Highways. Responsible for providing bridge services for all new capital projects and rehabilitation projects over $1 million. Duties included management of bridge project supervisors, consultant liasion, contract administration and technical review for the Region.

Patullo Bridge Rehabilitation , New Westminster, B. C. (1989 - 1990)

Project manager for the Ministry of Transportation and Highways responsible for ongoing rehabilitation projects on the Pattullo Bridge over the Fraser River, including seismic retrofit of bearings and replacement of deck joints and lateral bracing. Work included review and coordination of consultant design and specifications and contract administration.